-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty Lagoon. Annual reports for the period 27/6/2007 to 22/7/2018.
Continuing exploration for possible buried economic IOCG mineralisation on the western side of an area located between Lake Torrens and Pernatty Lagoon, under tenure of renewed EL 3854, was focussed on determining mineral systems geochemical...-
Document
Published: 23 Aug 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pernatty [Station]. Annual reports for the period 29/11/2005 to 28/11/2009.
An area centred approximately 110 km north of Port Augusta, covering part of the Pernatty Ridge plateau on the south-western side of Lake Torrens, approximately 145 km south-east of the Olympic Dam mine, was taken up to explore for possible economic...-
Document
Published: 24 May 1910