-
Lake Gilles. Progress reports and final report to licence expiry/full surrender, for the period 2/6/1980 to 3/7/1996.
Aeromagnetic, ground magnetic and EM surveys, with follow-up rock chip, stream sediment and soil sampling, RAB drilling (688 holes, total 17,553 m) and RC drilling (12 holes, total 1149 m), have defined an extensive zone of anomalous base metal...-
Document
Published: 15 May 1996
-
Lake Gilles (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 22/12/2005 to 13/9/2016.
Approximately one-third of the southernmost sub-block 'D' of the subject EL 5109 has been relinquished to comply with expenditure commitments made for the East Eyre Peninsula Project. Activities within the now relinquished area have consisted of...-
Document
Published: 10 Oct 1916
-
Coulta. Progress reports and annual report to licence expiry/full surrender for the period 23/2/1978 to 22/3/1979.
Exploration for possible economic vein-style primary uranium deposits hosted within basement rocks in a licence area located 55 km west-northwest of Port Lincoln has consisted of detailed (1:10,000 scale) geological mapping over a 650 square km area,...-
Document