-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 18/9/1979 to 17/9/1981.
Continued exploration for stratabound base metals across an area of the southern Stuart Shelf, extending west and north-west of Port Augusta, has included an evaluation of the results of previous stratigraphic drilling on the prior-held EL 332, plus...-
Document
Published: 16 Nov 1981
-
Red Lake. Progress reports to licence expiry/renewal, for the period 12/1/1976 to 11/1/1978.
The exploration target for stratabound base metals in the Red Lake area, which lies just to the east of Pernatty Lagoon and abuts the Arcoona Plateau, was the top of Pandurra Formation erosional surface. Percussion (17 holes totalling 2619 m) and...-
Document