-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Woomera Project. Joint annual reports for the period 29/9/2008 to 15/6/2017. Includes information status for EL 6085 at licence expiry, for period 16/06/2017 to 01/01/2023: no work performed.
No field work was performed on the three subject licences during the period 2008-2010 inclusive. During 2010, Dominion Gold Operations undertook a desktop evaluation of the possible iron ore potential of the licences. During 2011, the licensee...-
Document
Published: 01 Jan 1923