-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Lake Frome [West]. First partial surrender report, for the period 18/10/2013 to 17/10/2016.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 02 Nov 1917
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-11, Lake Blanche region Quaternary palaeochannel / palaeolake margin calcrete - hosted or roll-front style uranium mineral prospects. Project final report.
Approved PACE project DPY2-11 was an attempt to find calcrete or roll-front type sedimentary uranium mineralisation in Quaternary fluvial channels that drain the northern and eastern margins of the uranium-enriched Mount Painter and Mount Babbage...-
Document
Published: 20 Sep 1906