-
Beltana mine and Aroona zinc mine mining leases and retention leases (part of the Flinders Ranges Project). Option period first annual report, for the period 1/1/2000 to 30/12/2000.
During the first year of its evaluation of the Beltana and Aroona mining properties on which it has taken out an option, Perilya undertook the following intensive work programme aimed at locating buried extensions and repetitions of the willemite...-
Document
-
Furlough Dam. Progress reports for the period 28/7/80 to 27/4/81.
Results of the deep stratigraphic / mineral exploratory well MU-2 drilled near Mulyungarie Homestead, east of Lake Frome and adjacent to the SA/NSW State border, are presented, besides the interpretation of a gravity survey conducted earlier in the...-
Document
Published: 17 Nov 1981
-
Mount Uro. Progress, partial surrender [and ?final] reports to licence surrender for the period 29/4/1984 to 26/2/1987.
Adelaidean and Cambrian calcareous clastic rocks of the Angepena region were investigated for possible economic epigenetic base and precious metal mineralisation that may be related to syn-depositional faulting, as well as for stratiform and...-
Document
-
Final report on the Mount Chambers Project, South Australia - Part A.
There is no abstract created for this record-
Document
Published: 01 Jan 1969