Lake Tinko. Progress and final reports for the period 1/6/1973 to 31/5/1974.
A 50-hole rotary drilling program (total 3898 m) conducted near Lake Tinko and Billeroo Creek, south-east of Lake Frome, has partly delineated a north-south trending basement trough which, as a controlling influence on subsurface drainage, represents...-
Document
Published: 20 May 1974
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Callabonna / Petermorra (part of the Lake Elder Project). Annual reports for the period 19/3/1998 to 30/4/2015.
Exploration Licence 2494 was granted in March 1998 to Paladin Energy Minerals NL and Brightstar Power Corporation Pty Ltd - the Paladin Brightstar Joint Venture (PBJV), with Paladin Resources NL as manager. The target commodity being explored for by...-
Document
Published: 20 May 2015