-
East Maitland. Final report at licence surrender for the period 12/9/1979 to 11/3/1980.
In a search for possible economic Mississippi Valley - type base metal mineralisation within an area located 30 km north-east of Maitland, 941 auger holes for 6839.2 m total penetration were drilled at 100 to 200 m spacings along roadsides to test the...-
Document
Published: 07 Feb 1980
-
Bute. Progress reports and final report to licence full surrender, for the period 16/1/1980 to 30/6/1982.
In the latter stages of its search for possible economic base and precious metal deposits in the Bute area, North Broken Hill targeted the concealed pre-Adelaidean basement rocks for Mount Gunson or ?Olympic Dam type hydrothermal ores, and for Mount...-
Document