-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
Duntroon Basin. [Well critiques].
Contains summary pictorial montages of the operator's post-mortem assessment of the value of drilling each Duntroon Basin wildcat completed to date.-
Document
-
Greenly prospect file, EPP 26, Duntroon Basin, offshore South Australia.
BHPP's Greenly 1 well is herein proposed to test a faulted hanging wall anticline with minor crestal collapse faults, an estimated fault-dependent maximum closure area of 53.3 square km, and a closure height of 140 metres at the primary target. The...-
Document