-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
Greenly 001 EPP 26. Basic well completion report.
Greenly 1 wildcat was located in the southern part of EPP 26, approximately 10 km southeast of Platypus 1, 40 km west-northwest of Duntroon 1, and 150 km southwest of Port Lincoln. It was directionally drilled over the period 4 June to 14 August 1993...-
Document