Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Lake Macfarlane - Lake Finniss area. Progress reports to licence expiry/full surrender, for the period 1/7/1967 to 31/12/1967.
Consultants were engaged by the licensee to conduct an extensive geological and geochemical investigation of a 2700 square mile area surrounding the Mount Gunson copper deposit, and to perform an interpretation of available regional aeromagnetic data....-
Document