-
Pernatty Quarry. Reports on site investigations for the period September 1986 - March 1989, re. Pernatty Crushing Contract no. 1 [let to McMahon Construction Pty Ltd].
Geoscientific information on quarry materials, copied from former Highways Department files. The subject quarry site was chosen in order to provide crushed rock products for the reconstruction of the Pimba - Wirrappa section of the Stuart Highway....-
Document
Published: 17 Mar 1989
-
Hydrogeological data, lithologs and sample assays for water bores drilled during the period January 1974 to March 1976 in the Mount Gunson area.
During the period from January 1974 to March 1976, 35 vertical rotary percussion water wells were drilled and many were cased off, perforated and then fitted with submersible electric pumps and offtake piping, to supply mine process water to the Mount...-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document