-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Report on the Mount Whyalla barite mine, Pandurra area, SA.
Report briefly discusses the mode of occurrence and inferred genesis of a previously worked small barite deposit, now located within EL 50, that is the subject of new interest by a private prospector seeking permission to peg a mineral claim.-
Document