-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
RB 71/00161 Pernatty Lagoon barite deposit.
A deposit of barite, up to 20m wide and 350m long occurs in the Woocalla Dolomite Member at Pernatty Lagoon. The barite as indicated by grab samples, is associated with up to about 2.6 per cent strontium sulphate, 0.12 per cent iron oxide and 0.8 per...-
Document
Published: 04 Oct 1971