-
Tanner Dam. Annual reports and final report to licence expiry/full surrender, for the period 7/6/1996 to 15/10/2002.
The Tanner Dam Project was acquired to explore for concealed structural-related gold mineralisation, and Olympic Dam / Mount Leyshon - type hydrothermal or epigenetic base metal deposits, both associated with Gawler Range Volcanics and Hiltaba Suite...-
Document
Published: 16 Jan 1903