-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Ediacara Range. Progress and final reports on evaluation of phosphate prospects, for the period June to November 1975.
Exploration for possible commercial accumulations of sedimentary shallow marine phosphorite ore in the Ediacara 'Sub-basin', 26 km west of Beltana, has consisted of a search within the Early Cambrian strata for any sites or layers of phosphate...-
Document
-
Portulacca Ridge. Progress reports to licence expiry/renewal, for the period 16/3/1977 to 15/3/1979.
Areas around Woomera and extending to the north, to around 30 km west of Olympic Dam, were explored for concealed base metal deposits of Olympic Dam - type. Trace stratabound lead and zinc mineralisation (sphalerite and galena - few thousand ppm) had...-
Document