-
Nundroo (latterly part of the Eucla Basin Heavy Mineral Sands Project). Final report at licence expiry/full surrender, for the period 16/9/2014 to 15/9/2019.
An area comprising two separate blocks located ~20 km west and ~45 km north of Fowlers Bay has been explored for possible buried Pleistocene reworked heavy mineral sands (HM) marine placer mineralisation that may have become concentrated within the...-
Document
Published: 19 Sep 1919
-
Western Gawler Project. Final report, Magneto Telluric, Passive Seismic and Magnetic Modelling Study. Project ADI RD02-296 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises geophysical studies conducted by Western Areas between October 2021 and October 2022, under the ADI Agreement ADI: RD02/296-GP Magneto Telluric (MT), Passive Seismic and Magnetic Modelling Study. The discovery of magmatic Ni-Cu...-
Document
Published: 06 May 1923
-
Fig Tree Corner, Ooldea South, Barton, Colona North, Ooldea Range and Pidinga (the Eucla Basin HMS Project tenement Group One). Joint annual reports for the period 1/3/2011 to 31/12/2015.
During the 2011-2012 joint reporting year, Iluka undertook drilling on ELs 3638, 3742 and 4544 with three aims: to extend the Typhoon HM deposit resource, to follow-up results of brownfields drilling at the Sonoran prospect, and to do further infill...-
Document
Published: 28 Feb 1916
-
Novel technologies for [use in] mining and [earth resource] exploration: remote smart sensor deployment for in situ geophysical analysis. Final report, Project ADI RD01-123 [part of Accelerated Discovery Initiative Round 1, 2022].
Nine compact seismic motion recorders and nine co-located ground probe thermocouples have been deployed at various sites near the Carrapateena mine, to test the efficacy of making continuous remote data collection and the reliability of their...-
Document
Published: 27 Oct 1922
-
Honeymoon Uranium Project. Final report for approved seismic geophysical work programme, Project ADI RD01-100 [part of Accelerated Discovery Initiative Round 1, 2021].
Within two areas located north-west of Cockburn, Honeymoon Project licensee Boss Energy (Boss) is targeting possible sandstone-hosted uranium mineralisation in primarily palaeochannel-hosted, redox-controlled type occurrences, similar to the...-
Document
Published: 30 Nov 1921
-
Alford West. Final report, Project ADI RD03-386 [Accelerated Discovery Initiative Round 3, 2023].
“Defining Attributes for In-Situ Recoverable Cu Mineralisation by Geophysical Surveying” This Accelerated Discovery Initiative funded project sought to explore whether non invasive geophysical techniques can provide valuable insight into...-
Document
Published: 30 Jun 1923
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola, Moolawatana and Mount Hopeless (the Frome Basin Project). Joint annual report for the period 1/1/2016 to 31/12/2018.
Exploration Licence 5017 Arkaroola, Exploration Licence 5118 Mt Yerila and Exploration Licence 5261 Petermorra cover a combined area of approximately 1831 square km within the northern Flinders Ranges and the Frome Basin. The area is being targeted...-
Document
Published: 16 Jan 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document