-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill, Commonwealth Hill Station - Central and East, and Aurora Tank areas (the Commonwealth Hill Project). Joint annual reports for the period 1/7/2013 to 30/6/2018.
During the sixth year of the project, base metals exploration was focussed on the Mars-Aurora Tank, Wirrida and Bundi prospects using ground gravity and IP survey methods. Some trial magnetotelluric and audio-frequency magnetotelluric survey profiles...-
Document
Published: 05 Sep 1918
-
RB 2010/00015 Constraints on the timing of brittle faulting at [the] Challenger Mine.
The orebody at the Challenger gold mine shows remarkable down-plunge continuity, from the surface to some 1400 m vertical depth, which is geometrically equivalent to a down-plunge length of ~2800 m. However, at ~220 RL within the mine, the orebody is...-
Document
Published: 01 Aug 2010