-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
ExpNotes PARACHILNA (v2): Explanatory Notes PARACHILNA (second edition, 1999)
The PARACHILNA map area (31 to 32°S, 138 to 139.5°E) occupies the central Flinders Ranges which are made up of folded, mostly marine sedimentary Neoproterozoic and Cambrian rocks of the Adelaide Geosyncline, and adjoining plains underlain by Cainozoic...-
Document