-
Yudnamutana. Progress reports to licence expiry/renewal, for the period 24/6/1972 to 23/6/1973.
As part of continuing exploration for possible economic buried stratiform / hydrothermal copper mineralisation in the Yudnamutana Mining Field, the target lower Callanna Group strata were geologically mapped, petrologically studied and geochemically...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Arkaroola. Annual reports for the period 5/12/2008 to 3/12/2015.
During the 2008-2009 licence year, most of the new work done consisted of appraisal rotary mud drilling at Four Mile East (112 holes for 24,460 m) and Four Mile West (113 holes for 19,120 m), with the addition of one NQ diamond cored hole (AKC093) for...-
Document
Published: 20 Jan 1916
-
RB 73/00313 Crustal Study Project. An account of the work circumstances surrounding the Mount Fitton South mine 'big bang' controlled underground blast of 25/10/1972
As part of the Trans-Australia Seismic [Refraction] Survey (TASS) conducted during 1972 by the Bureau of Mineral Resources, Geology and Geophysics of the Commonwealth of Australia (BMR), approximately 82 t of explosive was instantaneously detonated by...-
Document
Published: 01 Jan 1973
-
RB 70/00188 Investigation of the Commonwealth mine, Mount Painter Province, Copley Umberatana.
There is no abstract created for this record-
Document
Published: 01 Jan 1970
-
Arkaroola. First partial surrender report at licence expiry/renewal, for the period 5/12/2001 to 4/12/2011.
An area on northern Arkaroola Station, which has since 26/4/2012 has been legally quarantined from mineral exploration operations under the South Australian Mining Act, was considered by its former titleholders to be prospective for an array of...-
Document