-
RB 2006/00005 The Southern Australian Archaean-Proterozoic Synthesis: Developing tectonic frameworks to assist mineral exploration. Abstract volume.
Includes abstracts with the following titles: 1) How magnetotellurics (MT) works, and an overview of new central Australian MT results (Kate Selway) 2) Latest MT traverse results: western Gawler Craton (Stephan Thiel) 3) A constrained 3D...-
Document
Published: 01 Feb 2006
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017