-
Data release - as updated [made at SA Director of Mines’ discretion] : Cowell (latterly part of the Cowell JV Project). Annual reports for the period 7/11/2008 to 6/11/2011.
No field work was undertaken during licence Year 7, but Stellar instead did a review of the Cowell area's prospectivity for Tertiary palaeochannel-hosted sedimentary uranium mineralisation. Previous drilling data for the local Pirie Basin sediments...-
Document
Published: 05 Dec 1911
-
RB 00337 Mineralogy of samples from Tallaringa bore.
Drill cuttings samples taken from the depth interval 102 to 173 feet KB in the SADM Tallaringa (water) bore were separated into light and heavy mineral fractions and these were examined microscopically. The sediments studied can be divided into two...-
Document
Published: 01 Sep 1900
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Joint annual reports for the period 1/1/2008 to 31/12/2010.
In an agreement with Oxiana, Toro Energy Limited has Uranium rights covering the Project area. In 2008, exploration activities within tenements comprising the Mount Woods Project targeted iron oxide copper gold (IOCG) style mineralisation. Drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 3 of 4 ].
During July 2000, the Minotaur Resources Ltd / Billiton Exploration Australia Pty Ltd mineral exploration alliance entity agreed to farm into the four Coober Pedy Project tenements held by Normandy Exploration (80%), Sons of Gwalia (13%) and Sabatica...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 4 of 4 ].
In 2006, work completed on the Prominent Hill Project in the reporting period included drilling of 17 RC holes for 4,255 m and 46 mud/diamond holes at Prominent Hill prospect for 14,301.5 m. The drilling at Prominent Hill intersected wide zones of...-
Document