-
Data release - as updated [made at SA Director of Mines’ discretion] : Midgee (latterly part of the Cowell JV Project). Annual reports for the period 26/11/2003 to 24/3/2019.
An area of the northern Cowell Hills was taken up to explore for possible economic basement-hosted copper-gold mineralisation of epigenetic style, analogous to that found at the Ernest Henry deposit, which may be associated with magnetic anomalies and...-
Document
Published: 08 May 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 2/8/2008 to 1/8/2014.
Rex Mineral’s ('Rex') primary objective in the Pine Point Project area is to determine the potential for economic basement-hosted iron oxide - associated copper-gold mineralisation such as that found at Olympic Dam, Prominent Hill, Ernest Henry and...-
Document
-
RB 73/00008 Geological survey, Torrens Hinge Zone Project, Bute region. Report no. 1.
This report outlines the history and concept of the Torrens Hinge Zone project. An account is given of the regional geology, geophysics, geochronology and stratigraphic drilling in the Bute region and adjoining areas of northern Yorke Peninsula. An...-
Document
Published: 01 Jan 1973
-
Mount Christie Siding (part of the Eucla Project). Annual reports and final report to licence expiry/full surrender, for the period 26/7/2005 to 20/3/2013.
The subject licence area, one of eight tenements which constitute Hindmarsh Resources Limited’s (Hindmarsh’s) Eucla [Basin] Project, has been explored for possible buried economic sedimentary uranium deposits that may have formed in Tertiary...-
Document
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Rounsevell Hill, Yellabinna and Mulgathing Homestead (the Ambrosia Project). Joint annual reports for the period 24/5/2005 to 1/6/2015.
Some large areas of vacant ground located in the south and west of Mulgathing Station that lie adjacent to the Bulgunnia Fault Zone were taken up by Monax Mining initially to explore primarily for Olympic Dam type IOCG-U mineralisation and also for...-
Document
Published: 06 Oct 1915
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
Nuckulla Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/10/2002 to 28/11/2008.
Exploration for possible buried Ernest Henry or Olympic Dam style copper-gold mineralisation in the Nuckulla Hill area, 120 km north-east of Ceduna, did not progress during the first two years of tenure due to uncertainties in selecting a new remote...-
Document
Published: 22 May 1909