-
Price. Progress reports to licence expiry/renewal, for the period 24/2/1975 to 23/2/1977.
In continuing regional exploration conducted over north-eastern Yorke Peninsula, further reconnaissance stratigraphic drilling and wireline geophysical logging (in 3 vertical rotary percussion holes totalling 373 m) was carried out in May 1976 to test...-
Document
-
Lake Torrens Station and Hawker West (the Torrens Project). Joint annual reports, plus separate final reports to licences' respective full surrender, for the period 30/4/2003 to 1/6/2010.
Olympic Dam style copper-gold mineralisation was the target of exploration in two adjoining areas which lie about 100 km north-northeast of Port Augusta and 55 km west of Hawker, on alluvial plains adjacent to south-eastern Lake Torrens. All of the...-
Document
Published: 30 Nov 1910