PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-30 - Hanging Knoll portion of Woodroffe Project area - Proterozoic basement-hosted base and precious metal mineral prospects. Drilling project final report.
Targeted stratigraphic and mineral exploratory drilling recently carried out by PepinNini Minerals within its EL 3931 Hanging Knoll was done as part of the sixth round of Theme 2 of the PACE Initiative (Primary Industries and Resources South...-
Document
Published: 15 Feb 1911
-
Everard Ranges examination: SML 510, Artoonanna Hill area. Progress reports for the period 19/11/1970 to 19/8/1971.
Results of previously conducted ground magnetometry, auger drilling, and costeaning, plus those of a current programme of diamond drilling (3 holes, total 1919 feet) have demonstrated that the mafic/ultramafic Wanka Wanka Dyke is a laterally...-