-
RB 44/00063 Myponga Dam Project - Geological investigation of the tunnel route on the proposed pipeline from the reservoir.
Detailed geological examination of the area in the vicinity of the proposed tunnel has shown that, provided suitable precautions are taken, there are no geological factors which will prevent the successful construction of a tunnel through the ridge...-
Document
Published: 02 May 1957
-
RB 79/00047 Port Lincoln planning study, engineering geology investigation.
The area surrounding Port Lincoln can be divided into three main physiographic regions, the aeolianite plain, the coastal plain, and the highlands. Soil types range from shallow, well-drained terra rossa overlying the aeolianite, to imperfectly...-
Document
Published: 01 Jan 1979
-
Data release : Mount Sarah, Alamilda Hill and Todmorden (the Mount Sarah Project). Annual reports and joint annual reports to the successive expiry/full surrender of ELs 6129 and 5634, for the overall period 23/6/2015 to 22/6/2020.
Three adjacent areas located in dissected hilly country 70-90 km to the north-west of Oodnadatta were successsively taken up under licence to cover a significant, 8 mGal regional gravity anomaly which could have potential for IOCG type basement-hosted...-
Document
Published: 24 Jun 1920