-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
RB 2007/00017 The geology of the Mulgathing Complex: from eastern Tallaringa to Glenloth Goldfield.
Reconnaissance investigations of outcropping rocks of the western and central Mulgathing Complex reveal a series of pelitic and psammitic sedimentary rocks, interleaved with generally mafic to intermediate composition meta-igneous lithologies. The...-
Document
Published: 01 Sep 2007
-
RB 2020/00029 Linking cover and basement rocks in the Central Gawler Craton, South Australia
Exploring effectively through cover is a fundamental challenge for the minerals industry in Australia, and the same need is driving the restructuring of mineral exploration strategies world-wide. The study area chosen for this particular research...-
Document
Published: 01 Nov 2020
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Deception Hill, Lake Everard West, Yellabinna, Cooritta Hill and Lake Everard (the Tunkillia Project). Joint annual reports for the period 1/1/2012 to 31/12/2018.
In 2012, the first year after the project's acquisition, TGL spent A$6.4M on gold exploration and on doing mining feasibility studies. The work program was mainly an ongoing evaluation of development opportunities for the Area 223 gold resource. Some...-
Document
Published: 29 Jan 2019
-
Wynbring [part of the Barton Project]. Annual reports and final report to licence expiry/full surrender, for the period 13/6/1995 To 12/6/2000.
Calcrete sampling over aeromagnetic targets within the Fowler Shear Zone was undertaken to locate evidence of possible Cu-Au mineralisation, developed during emplacement of Hiltaba Suite granites south and south-west of Wynbring. Weakly anomalous Au...-
Dataset
Published: 16 Aug 2000
-
Data release - as updated : Bulgunnia. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
An area centred approximately 70 km north-northeast of Tarcoola has been explored for possible economic buried basement-hosted IOCG style or other (e.g. Menninnie Dam and/or Mount Gunson type) altered rock facies - hosted metallic mineralisation,...-
Document
Published: 27 Oct 2022