-
Data release - as updated [made at SA Director of Mines' discretion] : Uley. Annual reports for the period 16/9/2005 to 12/10/2018.
A licence area located 20 km west-southwest of Port Lincoln, which covers the historically worked Uley graphite deposit and environs, was taken up to try to delineate sufficient mineral resources and, eventually, ore reserves of graphite in the Mining...-
Document
Published: 25 Mar 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919