-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Hill - Tod River area. Annual reports [to the commencement of the Northern Eyre Peninsula Project licences' combined reporting status] for the period 13/3/2002 to 12/3/2005.
An area which has had little exploration for iron ore done previously was taken up by Centrex Metals Ltd to cover potentially magnetite-rich Early Proterozoic banded iron formation (BIF) strata outcrops and subcrop located within the Lincoln Uplands...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat, Cummins, Strawberry Hill and Tarlinga (the Gum Flat Iron Ore Project). Joint annual reports for the period 1/7/2008 to 30/6/2010.
An area of southern Eyre Peninsula consisting of two separate tenement subgroups located in the Port Lincoln west and Cummins districts respectively is being explored for possible economic shallowly buried stratabound occurrences of haematite and...-
Document
Published: 01 Aug 1910
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 1921
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919
-
Data release [made at SA Director of Mines’ discretion] : [Coastal Magnetite Project] Iron ore prospects, eastern Eyre Peninsula. Project operator's report re. the prospects' 2002-2003 evaluation programme.
The key advantages of location and simple metallurgy of coastal Eyre Peninsula magnetite ores presented Portman Mining Ltd with an opportunity to enter a major under-explored and under-developed iron ore province and develop a new export business....-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
2008 Corunna area HyMap survey. Mineral maps Data Package.
HyVista Corporation was contracted by Mega Hindmarsh during April-May 2008 to process HyMap airborne hyperspectral scanner data acquired over the Corunna - Pandurra - Myall Creek area of SA on 16/3/1998. The nominal pixel size acquired was 4.7 m x 4.7...-
Dataset
- ZIP,
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-29, Wilcherry Hill Magnetite Project, Hercules Proterozoic stratabound iron ore mineral prospect. Project interim and final reports.
Iron ore mineralisation similar to that mined in the Middleback Range has been investigated at the Hercules prospect, located 90 km west-northwest of Whyalla, where a large, high intensity aeromagnetic anomaly and associated 12 km long outcrop of...-
Document