-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Deception Hill, Lake Everard West, Yellabinna, Cooritta Hill and Lake Everard (the Tunkillia Project). Joint annual reports for the period 1/1/2012 to 31/12/2018.
In 2012, the first year after the project's acquisition, TGL spent A$6.4M on gold exploration and on doing mining feasibility studies. The work program was mainly an ongoing evaluation of development opportunities for the Area 223 gold resource. Some...-
Document
Published: 29 Jan 1919
-
Data release [made at SA Director of Mines' discretion] : Lake Everard. Annual reports to licence expiry/renewal, for the period 7/11/1994 to 6/11/1999.
An originally large licence area centred approximately 70 km south-east of Tarcoola, which lies on the north-western margin of the Gawler Ranges and includes the north-western part of Lake Everard, is being explored for possible buried gold deposits...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Peterlumbo Hill (southern Gawler Ranges). Annual reports for the period 20/1/2004 to 2/3/2019.
The Peterlumbo Project area covers an area of 583 km2 and is situated 60 km north-west of Kimba, immediately south of the Gawler Ranges on the northern Eyre Peninsula. The initial primary exploration target within the tenement was the covered source...-
Document
Published: 14 Apr 1919
-
Hicks Hill. Annual reports plus final report to licence expiry/full surrender, for the period 9/12/2009 to 8/12/2014.
A previously discovered (SADM, 1950s) partly outcropping body of magnetite-rich Palaeoproterozoic BIF rock (jaspilite), located ~46 km east of Tarcoola, has been investigated afresh for its current economic potential as an iron ore resource. Similar...-
Document
Published: 20 Apr 1915
-
RB 2010/00001 Investigation of partial leach soil surveys at the Tunkillia gold prospect, South Australia.
Geochemical soil samples were taken along two traverses over shear-hosted gold mineralisation in Area '223' at the Tunkillia gold prospect, located 550 km north-west of Adelaide. The objective was to assess the effectiveness of near-surface soil...-
Document
Published: 01 Nov 2009
-
RB 2020/00026 PACE Copper Gawler Craton Airborne Survey, Region 6, Gairdner - enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Oct 2020
- ZIP,
-
RB 2020/00020 Gawler Craton Airborne Geophysical Survey Region 5, Streaky Bay – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Aug 2020
- ZIP,