-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Mulgathing and Jumbuck areas (part of the Gawler Project Central Tenement Block). Data release at licences' joint partial surrender: project joint venture - specific annual reports for the period 1/7/2009 to 22/9/2010.
As part of the ongoing Challenger Area Joint Venture with Southern Gold intended to complete brownfields exploration near the mine and to expedite greenfields exploration of the Christie Domain for Archaean metamorphic/hydrothermal gold, work carried...-
Document
Published: 05 Jan 1911
-
Mount Christie. Annual reports and final report to licence full surrender, for the period 23/2/2000 to 6/8/2002.
Interest in an area near Mount Christie Siding was stimulated by the 1993 MESA Barton Bedrock Drilling Programme, which detected anomalous gold, chromium, base metals and platinoid metals in subsurface layered ultramafics. A number of targets...-
Document
Published: 20 Nov 1902
-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document
Published: 19 Jun 1919
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-63 - Gawler Iron Project, Mount Christie district - Archaean BIF hosted stratabound iron ore prospects. Drilling project final report.
The Gawler Iron Project is situated approximately 25 km north of the Trans-Australian Railway and 200 km south-west of Coober Pedy, along the western margin of the Gawler Craton in South Australia. The project area formerly had not been systematically...-
Document
Published: 30 Jan 1912