Skip to content
Search Home
SARIG catalogue
  • HomeHome
  • Search Records
  • FAQs
  • Vocabularies
  • SARIG map SARIG map
  1. Datasets

Datasets

The mesac Open Data Portal datasets contain detailed records of seismic surveys and geochemical data, and they are made available here to industry, researchers and the public.
FILTER RESULTS
RESET
draw to search by area BY DRAWN AREA
RESET
Location SA

TYPE OF RECORD

  • document - (5)

TOPIC

  • Geoscientific Information - (5)

CATEGORY TYPE

  • Mineral Resources (Excl. Energy Resources) - (8)
    • Mineral Exploration - (5)
    • Primary Mining And Extraction Of Mineral Resources - (3)
  • Earth Sciences - (5)
    • Geochemistry - (5)
      • Exploration Geochemistry - (4)
    • Geology - (5)
      • Mineral System Geology - (5)
      • Petrology - (5)
      • Regional Geology - (5)
      • Resource Geology - (5)
        • Mineral Resource Geology - (5)
      • Stratigraphy - (5)
      • Sedimentology - (4)
      • Historical Geology - (3)
      • Basement Geology - (2)
      • Mineralogy And Crystallography - (2)
      • Surface Geology - (2)
      • Geochronology - (1)
      • Volcanology - (1)
    • Geophysics - (5)
      • Electrical And Electromagnetic Methods In Geophysics - (4)
      • Magnetics - (4)
      • Gravity - (3)
      • Petrophysics - (2)
      • Radiometrics - (1)
    • Physical Geography - (3)
      • Geomorphology And Regolith And Landscape Evolution - (2)
      • Hydrogeology - (2)
      • Surface Processes - (2)
      • Quaternary Environments - (1)
      • Surfacewater Hydrology - (1)
  • Engineering - (5)
    • Resources Engineering - (5)
      • Drilling Engineering - (5)
      • Mineral Processing/Beneficiation - (2)
      • Mining Engineering - (1)
    • Geomatic Engineering - (4)
      • Geospatial Information Systems - (1)
      • Photogrammetry And Remote Sensing - (1)
      • Remote Sensing - (1)
  • Environmental Sciences - (5)
    • Environmental Science And Management - (4)
      • Environmental Management - (5)
    • Soil Science - (1)
      • Soil Chemistry - (1)
  • Policy And Administration - (5)
  • Information And Computing Sciences - (3)
    • Artificial Intelligence And Image Processing - (3)
      • Image Processing - (2)
      • Expert Systems - (1)
  • Energy - (2)
    • Energy Exploration - (3)
  • Biological Sciences - (1)
    • Ecology - (1)

DOCUMENT TYPE

  • Mineral Company Report - (5)
    • Mineral Exploration - (5)

COMMODITY

  • iron - (5)
  • iron ore - (5)
  • magnetite - (5)
  • Critical minerals - (2)
  • industrial material - (2)
  • uranium - (2)
  • copper - (1)
  • gold - (1)
  • granite - (1)
  • graphite - (1)
  • manganese - (1)
  • nickel - (1)
  • precious metal - (1)

GEOLOGICAL PROVINCE

  • Coulta Subdomain - (5)
  • Gawler Craton - (5)
  • Cleve Subdomain - (2)
  • Gawler Range Volcanic Province - (1)

STRATIGRAPHY

  • Lower Middleback Jaspilite - (3)
  • Cook Gap Schist - (2)
  • Hutchison Group - (2)
  • Gawler Range Volcanics - (1)
  • Hiltaba Suite - (1)
  • Katunga Dolomite - (1)
  • Upper Middleback Jaspilite - (1)

FORMAT

  • PDF - (5)

UPDATE FREQUENCY

There are no UPDATE FREQUENCY that match this search

PUBLICATION DATE

Specific date: 1980, 20/04/1980, 04/1980

Date range: 1980-2022, 04/1980-08/1990

close
Search records
ADVANCED KEYWORD SEARCH
Include the following keywords:

5 records found

Category type: Environmental Management Commodity: Iron Geological province: Coulta Subdomain

Filter Results
  • The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.

    During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...
      Document Published: 09 Apr 2019
    • PDF
  • Tooligie Hill (latterly part of the Southern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 3/12/1999 to 18/4/2017.

    For the period from 1/1/2013 until the date of licence full surrender, the following additional activities were undertaken: - 1/1/2013 to 31/1/2013 – magnetite ore characterisation analyses, and interpretation of 2012 ground gravity survey data,...
      Document Published: 14 Jun 2017
    • PDF
  • PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-33 - Mount Hope district, south-western Eyre Peninsula, Archaean iron ore mineral prospects. Drilling project final report.

    The south-western Eyre Peninsula regional iron ore targeting project has recently been initiated due to the success of Lynch Mining’s previous, in part PACE Initiative - subsidised, exploratory drilling programmes (DPY2-38, January-March 2006 and...
      Document Published: 11 Nov 2011
    • PDF
  • Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].

    Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...
      Document Published: 31 Dec 2008
    • PDF
  • PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.

    Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...
      Document Published: 20 Apr 2007
    • PDF
Download in queue. Do not close this page.

Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.

Don’t want to wait? Request for a download link to be sent to you

Download started...

Your download will start automatically in a few seconds.

Request delivery

It usually takes us a few business days to deliver your selected downloads to you via an S3 bucket. Please leave your email address and we’ll be in touch when it’s ready.

Request submitted.

We’ll be in touch in the next few business days. Sometimes we can get a large number of requests, but we strive to get back to you quickly. If, after a few days you haven’t received an email, please email us on mesacOpenData@dnrme.qld.gov.au

Made with CKAN 2.9.7(1.79)
Acknowledgement
Copyright
Disclaimer
Privacy
Contact Us
South Australia Government