-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-09 - Margaret Dam, southern margin, Peake and Denison Inliers, kimberlite diamond prospect. Drilling project final report.
Monax Alliance's Margaret Dam Project is located on their EL 5347 Francis Creek, which is centred approximately 40 km south of William Creek in northern South Australia. The initial project work done for licence operator Monax Mining by geophysical...-
Document
-
Francis Swamp. Combined first and second annual reports/final report to licence expiry/full surrender, for the period 9/10/2013 to 8/10/2015.
An area believed to cover the concealed southern margin of the Peake and Denison Domain of the Northern Gawler Craton was taken up by the Monax-Antofagasta copper exploration consortium to explore for possible buried economic iron-oxide associated...-
Document
Published: 24 Nov 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty [Station] and Yeltacowie (the Punt Hill IOCG Project). Joint annual reports for the period 29/11/2009 to 6/1/2012.
Two adjoining licence areas located in the country east of Pernatty Lagoon that lies between 80 and 180 km north of Port Augusta are being explored by Monax Mining Limited (Monax) for economic Proterozoic basement-hosted Iron-Oxide associated...-
Document
Published: 21 Jun 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 1912
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Nullarbor, Yalata North and Yalata East (the Western Gawler Craton Project). Joint annual reports for the period 24/10/2012 to 2/4/2018.
A cluster of adjoining licence sub-blocks taken up in the Yalata region are being explored for possible buried Thompson Belt style magmatic copper-nickel mineralisation which could be associated with large strike-slip fault structures transecting the...-
Document
-
Woorong Creek. Data release : annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 1/6/2000 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 45...-
Document
-
Lyons [Siding] [formerly called Rounsevell Hill]. Third partial surrender report, for the period 25/10/2002 to 2/12/2008.
As part of a regional search for possible economic IOCG type mineralisation in an area of covered Hiltaba Suite granitic intrusions north-west of Tarcoola, EL 3994 (formerly EL 3040) was covered by a regional gravity survey in September-October 2005,...-
Document
-
Kulliparu. Annual reports and final report to licence expiry/full surrender, for the period 21/1/2010 to 20/1/2013.
An area located approximately 60 km east of Streaky Bay was taken up primarily because of old reports of gold prospectivity in the north of the tenement area at and near the historic Kattata mine. Marmota Energy considered that regional geological...-
Document
Published: 19 Feb 1913
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-27 - north-eastern Cleve Domain - basement granite investigations related to the Mullaquana area Tertiary sediment-hosted uranium mineral prospect. Final report.
The area of the Mullaquana Exploration Licence 3652 is underlain by a circular aeromagnetic anomaly which has been interpreted as being potentially a Hiltaba Suite granite pluton that may be the source of the uranium mineralisation recently discovered...-
Document
Published: 30 May 1911
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].
In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...-
Document
Published: 15 Nov 1913
-
RB 2001/00004 CHILDARA bedrock drilling program.
Fifty-eight shallow aircore holes totalling 2140.5 m were drilled by PIRSA's Mineral Resources Group in the Ceduna area during November 1999 to as part of a programme designed to assist regional mapping and geological interpretation of the CHILDARA...-
Document
Published: 01 Aug 2001
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document
-
RB 2023/00031 Secondary prospectivity of South Australia's mine waste - review
According to its Critical Minerals Strategy of 2022, Australia aims to turn into the “global critical minerals powerhouse” by 2030 by becoming an integral part of the international critical minerals supply chain (DISER, 2022). The Geological Survey of...-
Document
Published: 01 Nov 2023