The Adelaide Hills Project (now including the former Fleurieu Project tenements). Annual reports for the period 1/10/2013 to 30/11/2018 plus expiry/full surrender reports to 7/10/2023.
During the twelfth, 2013-2014 project year, work on the now combined licence holdings of the Terramin Group focussed on prospect evaluation done at Bird-in-Hand (environmental and hydrological studies), Wheal Barton and Golden Slope, plus the ongoing...-
Document
-
RB 2001/00001 Soil sampling for heavy metal contaminants - Brukunga Township Reserve.
A soil-sampling program conducted on the public reserve adjacent to Dawesley Creek in the township of Brukunga was designed to determine the likely hazard of heavy metal contamination in the reserve. The reserve is on a site containing a small amount...-
Document
Published: 01 Jan 2001