-
RB 95/00022 Five year technical review, 1991-1995 - Border (Groundwater Agreement) Act, 1985.
The Groundwater (Border Agreement) Act of 1985 legislated to provide a framework for the joint management of groundwater resources within a 40 km wide strip along the length of the South Australian and Victorian Border, which is referred to as the...-
Document
Published: 01 Jun 1995
-
RB 2007/00012 Mount Monster rhyolite deposit near Keith - potential resumption of quarrying.
Over the period from 1955 until 1976 an outcrop of Ordovician porphyritic rhyolite was quarried for road-sealing aggregate and rail ballast from two quarries at Mount Monster, 12 km south of Keith. The total recorded production was 548,000 tonnes....-
Document
Published: 01 May 2007
-
SA/Vic Border Groundwater Review Committee - Five-year technical review, 1996 - 2000.
The Groundwater (Border Agreement) Act of 1985 provides the legislative framework for the joint management of the groundwater resources along the South Australia/Victoria State border. The Act established a 40 km wide Designated Area along the...-
Document