Olary (part of the Braemar Iron Project). Annual reports to licence expiry/cancellation, for the period 20/9/2010 to 19/9/2015.
A licence area in the Olary district comprising three separate sub-blocks has been explored for possible economic stratabound iron ore occurrences within partly concealed Neoproterozoic bedrock. The subject ground was taken up by Wentworth Metals...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Bend Hut. Annual reports for the period 2/5/2011 to 1/5/2019.
A known, undeveloped stratabound Neoproterozoic magnesite deposit at Witchelina, for which resources and reserves have historically been defined, has been taken up afresh in anticipation that a beneficiation procedure can be developed that will result...-
Document
Published: 05 May 1919
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].
In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...-
Document
Published: 15 Nov 1913