-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [Index Part 1 of 2 ].
An area centred approximately 50 km south-east of Coober Pedy has been taken up after it was surrendered early in 2000 by the BHP Minerals / Western Mining Corp. joint venture consortium (cf. Env 8434). The main mineral commodities now being sought by...-
Document
-
Coober Pedy Project. Annual reports, joint annual reports, and final reports at individual licences' full surrender, for the period 4/4/2011 to 3/4/2015.
Five separate areas located in the northern Gawler Craton adjacent to the Mount Woods Domain, which to date have received only minor attention from mineral explorers and so have had limited drilling done, have been explored for possible buried...-
Document
Published: 15 Apr 1915
-
Warrina North, Warrina South, Mount Brady, Yarrabolina Hill, Mount Woods and Kangaroo Dam (the Mount Woods JV Project). Joint annual reports [on JV partners' independent exploration programmes] for the period 1/5/2010 to 31/1/2017.
During the 2011-2012 project reporting period, exploration activities within the Mount Woods Project area which were conducted by OZL primarily targeted IOCG style mineralisation. Work included: · a continuation of office-based target generation and...-
Document
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 1918