-
RB 73/00313 Crustal Study Project. An account of the work circumstances surrounding the Mount Fitton South mine 'big bang' controlled underground blast of 25/10/1972
As part of the Trans-Australia Seismic [Refraction] Survey (TASS) conducted during 1972 by the Bureau of Mineral Resources, Geology and Geophysics of the Commonwealth of Australia (BMR), approximately 82 t of explosive was instantaneously detonated by...-
Document
Published: 01 Jan 1973