Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
PACE Copper Gawler Craton Airborne Survey, Region 8B, data package.
During the period 10 October to 18 December 2017, most of the BILLA KALINA 1:250k map sheet area was flown under contract to the SA Government and Geoscience Australia as part of the PACE Copper Gawler Craton Airborne Survey. The intent of this survey...-
Dataset
- ZIP,
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 9/8/2010 to 8/8/2015.
During licence Year 16, on its renewed EL 4534 over the period October to December 2010, South Australian Coal Limited (SA Coal) undertook a drilling campaign of 15 rotary mud partly cored vertical holes for 2871 m which included 2064.7 m of coring,...-
Document
Published: 01 Sep 2016