-
Project progress report no. 1 on Blinman Copper Project Flinders Ranges, SA. Summary stage I results and diamond drilling proposal.
There is no abstract created for this record-
Document
Published: 01 Jan 1966
-
EL 6437 Annual Technical Report to period ending 24/11/2020
The Torrens joint venture project covers 818 km2 along the eastern limit of the Gawler Craton in a similar structural setting as the nearby Olympic Dam and Carrapateena deposits. This report outlines exploration undertaken during the period 25/11/2019...-
Document
Published: 24 Feb 2021
- ZIP,
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 2021
-
Walparuta Project geophysical program: acquisition and interpretation of high resolution airborne magnetic / radiometric and ground gravity surveys. Final report, Project ADI RD02-264 [part of Accelerated Discovery Initiative Round 2, 2022].
This report details the field acquisition and data processing, inversion and interpretation stages of the Walparuta geophysical program conducted in December 2021. The work was focussed on the Walparuta Project area, located 20 km north of Manna Hill...-
Document
Published: 28 Apr 2022