-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
Benagerie. Progress reports and annual reports, plus final report to licence full surrender, for the period 13/11/1979 to 9/3/1989.
TARGET: Sedimentary uranium in Tertiary sandstone, plus Olympic Dam type copper-gold mineralisation and Broken Hill or Mount Isa type stratiform base metal mineralisation in the underlying basement rocks. EXPLORATION: Stratigraphic drilling (162...-
Document