-
Prospect Hill. Progress reports from 8/5/85 to March 1989.
TARGET: Tin and base metals in sheared Middle-Proterozoic volcanics and granites.EXPLORATION: Two percussion drillholes (50 metres and 48 metres) and 17 channel chip sampling lines spread over 1 km tested the lode at the Southern Ridge prospect....-
Document
Published: 01 Jan 1989
-
Woolatchi, Boolkaree and Wittakilla. Joint first progress / final report to licence full surrender, for the period 23/11/1992 to 30/4/1993.
Exploration for Broken Hill type stratiform Pb-Zn and Olympic Dam style iron oxide - associated Cu-Au mineralisation within the covered extensions of the Mount Painter Inlier east of Moolawatana Homestead included an extensive low-level aeromagnetic...-
Document
Published: 18 May 1993
-
Data release - as updated [made at SA Director of Mines' discretion] : Yerelina. Annual reports for the period 18/9/2012 to 17/9/2018.
An extensive covered area centred ~100 km north of Leigh Creek and lying immediately west of the exposed basement rocks of the Mount Painter Inlier is being explored for possible Mount Isa style stratiform or Mississippi Valley type stratabound...-
Document
Published: 13 Nov 1918
-
RB 66/00019 Preliminary geochemical survey in the Yudnamutana area (Umberatana 1-mile sheet).
Geochemical soil sampling in the Yudnamutana area, between the smelters site and the Cockscomb mine, has outlined two distinct copper anomalies. One anomaly lies within the boundary of the Wywyana Formation, while the other lies along the contact...-
Document
Published: 01 Jan 1968
-
Quarterly report SML 704 South Australia period ending 30th September 1972.
There is no abstract created for this record-
Document
Published: 01 Jan 1972