-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Data release [made at SA Director of Mines' discretion] : Crystal Brook, Port Broughton, Port Pirie, Mundoora and Winninnowie (the Moonta North Project). Annual reports and combined annual reports for the period 19/10/2000 to 1/8/2008.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of exploration across a number of scattered Exploration Licences trending from Port Broughton in the south to...-
Document
Published: 18 Sep 2008