-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
Mutooroo. Progress reports for the period 19/4/80 to 3/10/86.
Mines Exploration re-assessed the 1975 mining feasibility study and carried out reconnaissance and detailed Sirotem surveys over the deposit. Noranda conducted follow up gravity and magnetic ground surveys and an experimental Max Min II EM survey...-
Document