-
Roopena and Iron Knob. Joint progress reports, joint annual reports and final report to licences' joint full surrender, for the period 22/4/1992 to 23/2/2000.
Exploration for Mount Isa style, Fe-oxide associated Cu-Au mineralisation has targeted Whyalla Group metasediments and associated Hiltaba Suite granitic intrusions within a 110 km long x 15 km wide, north - south aligned corridor situated west of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Moonta - Wallaroo area (where licence is subject in part to the Moonta Porphyry Joint Venture). Annual reports for the period 24/12/1996 to 11/4/2008. [ Index Part 1 of 2 ].
A 106 square km area, comprising two blocks which cover the main historic copper and gold - producing districts centred around the towns of Moonta and Kadina, is being explored afresh in an attempt to identify ore resources of quantity sufficient to...-
Document
-
Data release [made at SA Director of Mines' discretion] : Moonta - Wallaroo area (where licence is subject in part to the Moonta Porphyry Joint Venture). Annual reports for the period 24/12/1996 to 11/4/2008. [ Index Part 2 of 2 ].
When Phelps Dodge began managing exploration on EL 2885 in mid-2002, its focus was on defining structurally-controlled magnetic targets that had remained untested, but which could host significant sized deposits of Olympic Dam or Ernest Henry type...-
Document
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 2016
-
Data release - as updated : Minlaton South-west, Minlaton, Oaklands and Stansbury (the Yorke Peninsula Project). Annual reports, plus joint final report at remaining licences' respective expiry/full surrender, for the period 21/1/2008 to 10/10/2019.
Phoenix Copper has been exploring several tenement blocks located on western Yorke Peninsula, the prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit that may have formed in buried Proterozoic...-
Document
Published: 27 Nov 2019
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 2017
-
Port Hughes. Annual reports and final report to licence full surrender, for the period 29/11/2010 to 17/8/2017.
A licence consisting of three separate small sub-blocks that cover a large number of freehold broad-acre farms in the Bute - Agery - Moonta South district has been explored for possible buried economic IOCG mineralisation, which may have formed on or...-
Document
Published: 31 Aug 2017