The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-19, Murninnie mine area (north-eastern Spencer Domain) IOCG mineral prospects. Project final report.
The Murninnie Cu-Bi-Au deposit and mine environs, located approximately 40 km south-west of Whyalla, have not been seriously explored in more than 50 years due to quarantining of the deposit under Private Mine title. The lode-style deposit is exposed...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-56, northern Olympic Domain: Sloane Hill silver and IOCG mineral prospect. Project final report.
A PACE Initiative Year 4 subsidised drilling project carried out on Mount Eba Station, in an area located approximately 30 km south of the Prominent Hill mine, initially targeted a wide above background silver geochemical anomaly returned by sampling...-
Document
Published: 18 Dec 1907
-
Data release [made at SA Director of Mines' discretion] : Mullaquana. Annual reports for the period 20/11/2006 to 19/11/2009.
A tenement area located close to and along the eastern seaboard of the Eyre Peninsula, and which extends from Whyalla southwards for approximately 60 km, has been taken up to explore for possible economic buried primary, hard rock hosted uranium and...-
Document
Published: 20 Jun 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 1918
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-36, Roopena area copper/gold mineral prospects. Project interim and final reports.
Three previously untested, significant gravity anomalies were the targets for 4 exploratory vertical RC drillholes totalling 750 m, put down in areas west and north-west of Whyalla by Minotaur Exploration with funding assistance from PIRSA through its...-
Document
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 1916
-
Chinaman Hat Hill. First annual report plus final report to licence full surrender, for the period 20/6/2013 to 18/12/2014.
No work performed. A desktop assessment of indicated IOCG prospectivity concluded that the tenement, located ~ 16 km north of Tasman Resources' Titan prospect, had high risk due to a muted basement geophysical response and the poorly constrained but...-
Document
Published: 21 Jan 1915
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 1917
-
Pernatty [Station] (part of the Punt Hill Project). First partial surrender report at licence expiry/renewal, for the period 29/11/2005 to 7/5/2016.
Two separate sub-areas formerly comprising 33% of a licence area located between Pernatty Lagoon and the southern end of Lake Torrens have been relinquished by licensee Monax Mining. The exploration objective for holding this ground previously had...-
Document
Published: 27 Jun 1916
-
Data release - as updated [made at SA Director of Mines’ discretion] : Glenside. Annual reports to licence expiry/renewal, for the period 5/12/2005 to 4/12/2010.
An area centred approximately 40 km south of the Andamooka Opal Field and 50 km south-east of the Olympic Dam mine is being explored for possible buried economic Olympic Dam or Prominent Hill type IOCG-U mineralisation as well as for possible...-
Document
Published: 28 Jan 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty [Station] and Yeltacowie (the Punt Hill IOCG Project). Joint annual reports for the period 29/11/2009 to 6/1/2012.
Two adjoining licence areas located in the country east of Pernatty Lagoon that lies between 80 and 180 km north of Port Augusta are being explored by Monax Mining Limited (Monax) for economic Proterozoic basement-hosted Iron-Oxide associated...-
Document
Published: 21 Jun 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 2/8/2008 to 1/8/2014.
Rex Mineral’s ('Rex') primary objective in the Pine Point Project area is to determine the potential for economic basement-hosted iron oxide - associated copper-gold mineralisation such as that found at Olympic Dam, Prominent Hill, Ernest Henry and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document