-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
Spilsby Island. Progress and final reports to licence expiry/full surrender for the period 18/6/1970 to 17/6/1971.
SML 434 was taken out to enable making a re-assessment of the economic potential of exposed molybdenite-scheelite mineralisation first identified along the southern shores of Spilsby Island during 1963. There, outcropping equigranular Lower...-
Document
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017