-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
RB 72/00007 Reconnaissance survey of ballast sources Tarcoola Alice Springs standard gauge railway Mount Willoughby, Northern Territory - Commonwealth Rail.
This report describes potential ballast sites on the Mount Willoughby - Northern Territory Border section of the proposed Tarcoola -Alice Springs standard gauge railway. Sedimentary rocks of Mesozoic and Tertiary age south of Marla Bore do not provide...-
Document
Published: 18 Jan 1972
-
Boundary Dam. First partial surrender report, for the period 20/7/2007 to 19/7/2010.
A small licence area taken up approximately 130 km north of Marla, near the SA/NT state border, is being explored for possible economic secondary uranium mineralisation formed in sandstone or calcrete. Prior to Tianda Resources deciding to apply for...-
Document
Published: 27 Sep 1910