PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-21 - Yerelina Gladstone Mining Field sediment-hosted and structurally controlled hydrothermal/replacement style stratabound base metal prospects. Final report.
PDF File Exceeds Size Limit: The file you are attempting to view exceeds the maximum allowable size of 50MB. Please download to view the content.
Additional information
Description | |
---|---|
Format | |
Size | 204.90 MB |
Created | November 12, 2024 |
Data last updated | November 12, 2024 |
License | Creative Commons Attribution 4.0 |