2022 Dombey 3D Seismic Survey.
Beach Energy contracted Terrex Seismic to acquire the Dombey 3D Seismic Survey in the Otway Basin, South Australia. Field acquisition was from 2nd Feb 2022 until 11th Mar 2022. The primary objective of the survey was to image structural targets around...-
Document
Published: 29 May 2024
-
PEL 687 Natural hydrogen exploration drilling and well testing - environmental impact report. August 2023.
Gold Hydrogen Ltd is exploring for natural hydrogen over Petroleum Exploration Licence (PEL) 687, which covers large sections of Yorke Peninsula and Kangaroo Island. As a replacement for carbon-based fuels, naturally occurring hydrogen (also known as...-
Document
Published: 21 Sep 2023
-
PEL 182 Banjo work area seismic operations - environmental impact classification. July 2024.
Pursuant to Section 98 of the Petroleum and Geothermal Energy Act 2000 the Minister must classify the regulated activities covered by a prepared Environmental Impact Report as either of low, medium or high environmental impact. This document...-
Document
Published: 10 Jul 2024
-
Beach Energy's proposed onshore Otway Basin petroleum production & processing activities - government consultation comments. 2019.
These government consultation comments cover proposed petroleum production & processing activities in the Otway Basin of South Australia.-
Document
Published: 01 Feb 2019
-
Beach Energy's proposed onshore Otway Basin petroleum production & processing activities - public consultation comments. 2019.
If an activity is deemed by the Department for Energy and Mining (DEM), in consultation with relevant co-regulatory agencies, to be of medium impact according to the criteria for classifying the level of environmental impact of regulated activities...-
Document
Published: 01 Feb 2019
-
Leigh Creek Energy geophysical operations - public consultation. October 2019.
If an activity is deemed by the Energy Resources Division in consultation with relevant co-regulatory agencies, to be of Medium Impact according to the criteria for classifying the level of environmental impact of regulated activities then public...-
Document
Published: 28 Oct 2019
-
QSN Link Pipeline, QSN Expansion Pipeline and Moomba Interconnect Pipeline - environmental impact report. April 2020.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an environmental impact report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 01 Jan 2020
-
Assessment of Leigh Creek Energy UCG trial proposal. April 2018.
Assessment report summarising the main findings in relation to the potential issues and environmental risk associated with proposed underground coal gasification trial proposal at Leigh Creek, South Australia and in particular how they will be managed...-
Document
Published: 01 Apr 2018
-
Leigh Creek Energy geophysical operations - environmental impact report. July 2020.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 10 Sep 2020
-
Annual and Technical Reports for GEL 97.
This report on the South Australian Permit GEL97 is a review of the existing seismic, gravity and magnetic data to assess its future use in the investigation of the morphology of the granite basement including any lineations and/or faulting that may...-
Document
Published: 10 Jan 2005
-
SAPEX proposed fracture stimulation Arckaringa Basin – government consultation comments. 2018.
These government consultation comments cover proposed proposed fracture stimulation in the Arckaringa Basin of South Australia.-
Document
Published: 04 Jun 2018
-
Leigh Creek Energy in situ gasification demonstration plant - public consultation comments. 2018.
If an activity is deemed by the Department for Energy and Mining (DEM), in consultation with relevant co-regulatory agencies, to be of medium impact according to the criteria for classifying the level of environmental impact of regulated activities...-
Document
Published: 28 Feb 2018
-
Assessment of SAPEX proposed fracture stimulation activities Arckaringa Basin. March 2019.
Assessment report summarising the main findings in relation to the potential issues and environmental risk associated with proposed fracture stimulation activities in the Arckaringa Basin of South Australia and in particular how they will be managed...-
Document
Published: 01 Mar 2019
-
Leigh Creek Energy geophysical operations - government consultation. October 2019.
If an activity is deemed by the Energy Resources Division in consultation with relevant co-regulatory agencies, to be of Medium Impact according to the criteria for classifying the level of environmental impact of regulated activities then public...-
Document
Published: 28 Oct 2019
-
Assessment of Beach Energy's proposed onshore Otway Basin petroleum production & processing activities. October 2019.
Assessment report summarising the main findings in relation to the potential issues and environmental risk associated with petroleum production & processing activities in the Otway Basin of South Australia and in particular how they will be...-
Document
Published: 01 Oct 2019
-
SAPEX proposed fracture stimulation Arckaringa Basin – public consultation comments. 2018.
If an activity is deemed by the Department for Energy and Mining (DEM), in consultation with relevant co-regulatory agencies, to be of medium impact according to the criteria for classifying the level of environmental impact of regulated activities...-
Document
Published: 04 Jun 2018
-
Santos Cooper Basin carbon storage - environmental impact classification. April 2021.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the minister to classify the activities to which an environmental impact report relates as either low, medium or high impact activities. This forms the basis of an environmental impact...-
Document
-
QSN Link Pipeline, QSN Expansion Pipeline and Moomba Interconnect Pipeline - statement of environmental objectives. April 2020.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum production to prepare a draft statement of environmental objectives (SEO) prior to production operations...-
Document
Published: 01 Jan 2020
-
QSN Link Pipeline, QSN Expansion Pipeline and Moomba Interconnect Pipeline - environmental impact classification. April 2020.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the Minister to classify the activities to which an environmental impact report (EIR) relates as either low, medium or high impact activities. This forms the basis of an environmental...-
Document
Published: 01 Jan 2020
-
Beach, geophysical operations in the Otway Basin, South Australia - environmental impact classification. May 2021.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the minister to classify the activities to which an environmental impact report relates as either low, medium or high impact activities. This forms the basis of an environmental impact...-
Document